SAP system copy Multicloud: the systems involved with different hyperscalers

Direkt zum Seiteninhalt
Multicloud: the systems involved with different hyperscalers
Conclusion
Unicode conversion: During the copy, the system is converted from non-Unicode to Unicode. This happens in the context of a homogeneous or heterogeneous system copy. In connection with Unicode must be differentiated between the system copy of a Unicode system and the Unicode conversion.

The Migration Monitor: is a standalone tool implemented in Java, takes over the management and control of the R3load processes, is downward compatible. Use the latest Migration Monitor version of the highest release!
Before shutting down the target system
Typically, the "homogeneous SAP system copy" process involves a large number of manual activities. A certain skill level is required for this, which leads to the fact that usually the employees of the SAP Basis department or external service providers realize the system copy. Depending on the structure and size of the systems, this process can take anywhere from hours to several days. In addition to making the target systems unavailable to operations and project teams, system and landscape copies also block SAP Basis administrators. Other challenges include the varying duration and quality (completeness) of the results depending on the processor, time dependency on the employees performing the work, etc..

Shutting down and copying virtualized systems, such as VMware instances, requires just a few mouse clicks. VMware is suitable for running multiple training, development and test environments on one physical system. Larger productive systems, on the other hand, are not so easy to virtualize. If users have to shut down the productive system during the copy, the runtime of the operation or the unavailability of the productive system becomes a critical factor.

SAP system copy can be done easier and faster with "Shortcut for SAP Systems".

An alternative to this is a refresh using a client copy.

Development and test work then takes place on a QA system that does not correspond to the production system.